86-511-86095270

Product Categories

Contact Us

Jiangsu Bailey Steel Bridge Co.,Ltd

Address: N0.2 Meilinwan Branch Road,Dingmao District, Zhenjiang, Jiangsu, China (Mainland)

Contact Person: Mr.Jack Wang (manager)

Tel: 86-511-86095270

Fax: 86-511-88881212

Mobile Phone: 86-15862985234

E-mail: jsbaileybridge@163.com

Website: http://www.cnbailey.com

Modular Bridge

Specifications 1 To assemble Bailey Bridge 2 Easy to carry 3 Convenient to Transport 4 Sufficient Stock 5 Factory directly delivery Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough...

      Product Details

    Specifications
    1 To assemble Bailey Bridge
    2 Easy to carry
    3 Convenient to Transport
    4 Sufficient Stock
    5 Factory directly delivery

    Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
    Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
    The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

    The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc. 

    Span Construction-Load Table ---Extra Single Lane (W=4200mm)
    SPAN-ftHS-15HS-20HS-25
    30SSSSSS
    40SSSSSS
    50SSSSSS
    60SSSSSS
    70SSSSSSR
    80SSSSRSSR
    90SSRSSRSSR
    100SSRSSRSSR
    110SSRSSRDS
    120SSRDSDSR1
    130DSDSR1DSR2H
    140DSR1DSR2HDSR3H
    150TSTSR2DSR2HDSR4H
    160DSR2HDSR2HTSR2
    170TSR2TSR2TSR3
    180TSR2TSR3TSR3H
    190TSR3HTSR3QSR4
    200QSR4TSR3QSR3 QSR4
    Span Construction-Load Table ---Double Lane (W=7350mm)
    SPAN-ftHS-15HS-20HS-25
    30SSSSSS
    40SSSSSS
    50SSSSSSR
    60SSSSRSSR
    70SSRSSRDS
    80SSRDSDSR1
    90SSRHDSR1DSR2H
    100DSR1DSR2HTSR2
    110DSR1DSR2QS
    120TSDSR2HTSR2
    130DSR2HTSR2TSR3
    140TSR2TSR3TSR3H
    150TSR3HTSR3HQSR4
    160QSR4QSR4QSR4
    170QSR4QSR4
    180QSR4

    1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc.
    2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc.
    Hot Tags: modular bridge, loading bridge, China, manufacturers, factory, wholesale, cheap

     

    Home | About Us | Products | News | Knowledge | Contact Us | Feedback | Mobile | XML

    TEL: 86-511-86095270  E-mail: Syuejsbeilei@outlook.com