
Access Bridge Gangway for Floating Dock
Description
Technical Parameters
We are also focusing on enhancing the things administration and QC program in order that we could keep fantastic advantage within the fiercely-competitive enterprise for Steel Arch Bridge, alloy steel plate, q345b steel bailey bridge. As an important manifestation and realization method, service innovation plays an important role in helping our company gain competitive advantages. We strictly manage the company with new technology, high standards and high quality, and satisfy consumers with perfect design, preferential prices and high-quality after-sales service, so as to achieve the goal of win-win cooperation.
Specifications
1 To assemble Bailey Bridge
2 Easy to carry
3 Convenient to Transport
4 Sufficient Stock
5 Factory directly delivery
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
| Span Construction-Load Table ---Extra Single Lane (W=4200mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SS |
| 60 | SS | SS | SS |
| 70 | SS | SS | SSR |
| 80 | SS | SSR | SSR |
| 90 | SSR | SSR | SSR |
| 100 | SSR | SSR | SSR |
| 110 | SSR | SSR | DS |
| 120 | SSR | DS | DSR1 |
| 130 | DS | DSR1 | DSR2H |
| 140 | DSR1 | DSR2H | DSR3H |
| 150 | TSTSR2 | DSR2H | DSR4H |
| 160 | DSR2H | DSR2H | TSR2 |
| 170 | TSR2 | TSR2 | TSR3 |
| 180 | TSR2 | TSR3 | TSR3H |
| 190 | TSR3H | TSR3 | QSR4 |
| 200 | QSR4 | TSR3QSR3 | QSR4 |
| Span Construction-Load Table ---Double Lane (W=7350mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SSR |
| 60 | SS | SSR | SSR |
| 70 | SSR | SSR | DS |
| 80 | SSR | DS | DSR1 |
| 90 | SSRH | DSR1 | DSR2H |
| 100 | DSR1 | DSR2H | TSR2 |
| 110 | DSR1 | DSR2 | QS |
| 120 | TS | DSR2H | TSR2 |
| 130 | DSR2H | TSR2 | TSR3 |
| 140 | TSR2 | TSR3 | TSR3H |
| 150 | TSR3H | TSR3H | QSR4 |
| 160 | QSR4 | QSR4 | QSR4 |
| 170 | QSR4 | QSR4 | |
| 180 | QSR4 | ||
| 1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
| 2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
We attach great importance to the accumulation and progress of technology, and continue to innovate Access Bridge Gangway for Floating Dock that adapt to the development of the times. Our company is working by the operation principle of 'integrity-based, cooperation created, people oriented, win-win cooperation'. In spite on the high quality objects we offer you, effective and satisfying consultation service is supplied by our qualified after-sale service group.
Hot Tags: Modular Bridge, loading bridge, China, manufacturers, factory, wholesale, cheap, bailey bridge part over bridge, bridge with long span, rigid bridge frame, bailey bridge assembly parts, bailey bridge part suppliers, Bailey Bridge Transom
Send Inquiry
You Might Also Like






