Anchor Bearing Plate or Prestress Concrete

Anchor Bearing Plate or Prestress Concrete

Specifications 1 Bailey Bridge Component 2 Receive the Press Power from the girder 3 Helpful to the Bridge Locating on Abutment It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge...
Send Inquiry
Chat Now

Description

Technical Parameters

It is this quest that makes our product performance far surpass industry standards, making us a leading manufacturer of High Bridge, Cable Hose Bridges, standard steel deck in the global marketplace. According to the different needs of the market, our company has a large number of product specifications, sufficient inventory, and a complete and scientific quality management system. We apply the life cycle concept to improve the performance of customer solutions, carefully considering material selection, processing more efficient and optimizing functions.

Specifications
1 Bailey Bridge Component
2 Receive the Press Power from the girder
3 Helpful to the Bridge Locating on Abutment

It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

Our Anchor Bearing Plate or Prestress Concrete is rich and diverse, with high quality and low price, which meet the needs of different levels of market. We have complete material production line, assembling line, quality control system, and the most importantly, we have many patents technology and experienced technical&production team, professional sales service team. In line with the principle of seeking common ground while reserving differences and win-win cooperation, we encourage colleagues to be inclusive when facing problems.

Hot Tags: bridge bearing plate, steel bearing plate for bridge, China, manufacturers, factory, wholesale, cheap, bridge for sustainable development, bridge for cemeteries, Galvanized Strong Transom, bridge for mountainous regions, Painted Steel Bridge, Transport Bridge

Send Inquiry