Construction Material Zinc Coated Steel Floor Decking Sheet

Construction Material Zinc Coated Steel Floor Decking Sheet

Specifications 1 Bailey Bridge Component 2 Receive the Press Power from the girder 3 Helpful to the Bridge Locating on Abutment It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge...
Send Inquiry
Chat Now

Description

Technical Parameters

We will initially maintain the business philosophy of quality and continue to provide our customers with superior Bailey Chord Bolt, Large Span Bridge, bailey steel railway bridge. The 'honest spirit' we stick to is to treat people with sincerity and work together with faith. We hope to improve the innovation mechanism and organizational structure through continuing to strengthen the sustainable development path, and integrating internal and external resources from a strategic height.

Specifications
1 Bailey Bridge Component
2 Receive the Press Power from the girder
3 Helpful to the Bridge Locating on Abutment

It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

We need to keep pace with market developments, combine our own current conditions, and make full use of technological changes to develop our Construction Material Zinc Coated Steel Floor Decking Sheet. We will continue to improve the quality of production, in order to thank customers for their long-term support and cooperation with our company, but also to open up new business areas. Our corporation has been specializing in brand strategy.

Hot Tags: bridge bearing plate, steel bearing plate for bridge, China, manufacturers, factory, wholesale, cheap, bridge for research facilities, Bailey Bridge Panel, bailey bridge clip parts, bailey bridge part spanning, civilian bailey bridge parts, bridge for microwave towers

Send Inquiry