
Hydraulic Pump Yard Ramp Mobile Loading and Unloading Bridge
Description
Technical Parameters
Our company's products and the level of profit making tax are among the best in the industry and the Bridge Cutting Machine, concrete deck panels, deck plate girder bridge are sold well all over the country and overseas. Based on the world, we take the lead in introducing international advanced product design concept, manufacturing technology and quality control process to ensure the reliability of products. Enthusiasm, integrity and innovation are our code of conduct. We hope to cooperate with you to promote the common development and continuous progress of our career.
Specifications
1 To assemble Bailey Bridge
2 Easy to carry
3 Convenient to Transport
4 Sufficient Stock
5 Factory directly delivery
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
| Span Construction-Load Table ---Extra Single Lane (W=4200mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SS |
| 60 | SS | SS | SS |
| 70 | SS | SS | SSR |
| 80 | SS | SSR | SSR |
| 90 | SSR | SSR | SSR |
| 100 | SSR | SSR | SSR |
| 110 | SSR | SSR | DS |
| 120 | SSR | DS | DSR1 |
| 130 | DS | DSR1 | DSR2H |
| 140 | DSR1 | DSR2H | DSR3H |
| 150 | TSTSR2 | DSR2H | DSR4H |
| 160 | DSR2H | DSR2H | TSR2 |
| 170 | TSR2 | TSR2 | TSR3 |
| 180 | TSR2 | TSR3 | TSR3H |
| 190 | TSR3H | TSR3 | QSR4 |
| 200 | QSR4 | TSR3QSR3 | QSR4 |
| Span Construction-Load Table ---Double Lane (W=7350mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SSR |
| 60 | SS | SSR | SSR |
| 70 | SSR | SSR | DS |
| 80 | SSR | DS | DSR1 |
| 90 | SSRH | DSR1 | DSR2H |
| 100 | DSR1 | DSR2H | TSR2 |
| 110 | DSR1 | DSR2 | QS |
| 120 | TS | DSR2H | TSR2 |
| 130 | DSR2H | TSR2 | TSR3 |
| 140 | TSR2 | TSR3 | TSR3H |
| 150 | TSR3H | TSR3H | QSR4 |
| 160 | QSR4 | QSR4 | QSR4 |
| 170 | QSR4 | QSR4 | |
| 180 | QSR4 | ||
| 1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
| 2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
Since the establishment of our company, we have taken the promotion of national industries as our own responsibility and our goal is to become a leading provider of Hydraulic Pump Yard Ramp Mobile Loading and Unloading Bridge in China. We have customers from more than 20 countries and our reputation has been recognized by our esteemed customers. We welcome customers from all over the world come to discuss business.
Hot Tags: Modular Bridge, loading bridge, China, manufacturers, factory, wholesale, cheap, bailey bridge equipment, different types of formwork, bridge for urban areas, bridge for railway crossings, Galvanized Strong Transom, bridge for resorts
Send Inquiry
You Might Also Like






