
M-PE Sliding Plate
Description
Technical Parameters
In order to produce container bridge fitting, loading bridge, steel arch bridge construction that lead the market and meet users' needs, our company conducts in-depth communication with thousands of consumers every year to understand consumers' pain points and real needs. We are adhering to the corporate culture of 'management with morality, sincere service and technical guarantee', continue to enhance development strength, improve product categories, and create maximum benefits for customers with high-quality products, reasonable prices and considerate services. As an experienced group we also accept customized order and make it same as your picture or sample specifying specification and customer design packing.
Specifications
1 Bailey Bridge Component
2 Receive the Press Power from the girder
3 Helpful to the Bridge Locating on Abutment
It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Through scientific and objective analysis and collation, our company has carried out accurate and effective market positioning, provided M-PE Sliding Plate design scheme in line with the needs of enterprise development. Our high-quality production and sales service team can provide you with a full range of services. We have a stable and high-quality production platform, which can ensure timely delivery to customers.
Hot Tags: bridge bearing plate, steel bearing plate for bridge, China, manufacturers, factory, wholesale, cheap, bailey bridge part on soft ground, bridge for archaeological sites, bridge for truck traffic, bridge for fitness centers, Steel Deck, bailey bridge part for irrigation projects
Send Inquiry
You Might Also Like





