
OEM Design Galvanize Steel Electric Cable Bridge
Description
Technical Parameters
We are an energetic business with wide market for Assembled Structure Panel, Bridge Bearing Pad, Composite Panel. Our experienced specialized group will be wholeheartedly at your support. While producing high-quality and high-efficiency products, we also provide customers with batches of cost-effective products from the customer's point of view, and provide them with cordial and caring services. You will be most welcome to come to China, to our city and to our manufacturing facility! Our company has a lot of experienced staff, efficient sales and engineering team.
Specifications
1 Bailey Type bridge
2 Portable pre-fabricated truss bridge
3 Fast Install
4 easy assemble
5 light transport
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
| Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SS |
| 60 | SS | SS | SS |
| 70 | SS | SS | SSR |
| 80 | SS | SSR | SSR |
| 90 | SSR | SSR | SSR |
| 100 | SSR | SSR | SSR |
| 110 | SSR | SSR | DS |
| 120 | SSR | DS | DSR1 |
| 130 | DS | DSR1 | DSR2H |
| 140 | DSR1 | DSR2H | DSR3H |
| 150 | TSTSR2 | DSR2H | DSR4H |
| 160 | DSR2H | DSR2H | TSR2 |
| 170 | TSR2 | TSR2 | TSR3 |
| 180 | TSR2 | TSR3 | TSR3H |
| 190 | TSR3H | TSR3 | QSR4 |
| 200 | QSR4 | TSR3QSR3 | QSR4 |
| Span Construction-Load Table --- Double Lane (W=7350mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SSR |
| 60 | SS | SSR | SSR |
| 70 | SSR | SSR | DS |
| 80 | SSR | DS | DSR1 |
| 90 | SSRH | DSR1 | DSR2H |
| 100 | DSR1 | DSR2H | TSR2 |
| 110 | DSR1 | DSR | QS |
| 120 | TS | DSR2H | TSR2 |
| 130 | DSR2H | TSR2 | TSR3 |
| 140 | TSR2 | TSR3 | TSR3H |
| 150 | TSR3H | TSR3H | QSR4 |
| 160 | QSR4 | QSR4 | QSR4 |
| 170 | QSR4 | QSR4 | |
| 180 | QSR4 | ||
| 1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
Our keen insight into the market direction and accurate grasp of customer needs make our OEM Design Galvanize Steel Electric Cable Bridge more innovative and flexible. Based on our own reality, we have carried out a series of effective corporate culture construction activities to enhance employees' loyalty to the company. We are committed to creating human-centered rules and systems, cultivating a humble temperament and common sentiment, and strive to create a good corporate environment.
Hot Tags: high quality steel structure bridge, China, manufacturers, factory, wholesale, cheap, bridge for infrastructure projects, bridge for schools, steel bearing plate for bridge, heavy duty bailey bridge parts, bridge for police stations, Concrete Girder Bridge
Send Inquiry
You Might Also Like




