
Plastic Pontoon Easy Dock Modular Pontoon Access Bridge
Description
Technical Parameters
Being kind to customers and employees is our company's business philosophy, and making the best quality double bridge, steel sway brace, concrete deck panels for consumers is our highest pursuit. With long-term accumulation of technical strength and well-trained scientific and technical personnel and management team, we provide customers with first-class solutions to create a better future together. We attach great importance to the investment in scientific research and the introduction of high-quality professionals.
Specifications
1 To assemble Bailey Bridge
2 Easy to carry
3 Convenient to Transport
4 Sufficient Stock
5 Factory directly delivery
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
| Span Construction-Load Table ---Extra Single Lane (W=4200mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SS |
| 60 | SS | SS | SS |
| 70 | SS | SS | SSR |
| 80 | SS | SSR | SSR |
| 90 | SSR | SSR | SSR |
| 100 | SSR | SSR | SSR |
| 110 | SSR | SSR | DS |
| 120 | SSR | DS | DSR1 |
| 130 | DS | DSR1 | DSR2H |
| 140 | DSR1 | DSR2H | DSR3H |
| 150 | TSTSR2 | DSR2H | DSR4H |
| 160 | DSR2H | DSR2H | TSR2 |
| 170 | TSR2 | TSR2 | TSR3 |
| 180 | TSR2 | TSR3 | TSR3H |
| 190 | TSR3H | TSR3 | QSR4 |
| 200 | QSR4 | TSR3QSR3 | QSR4 |
| Span Construction-Load Table ---Double Lane (W=7350mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SSR |
| 60 | SS | SSR | SSR |
| 70 | SSR | SSR | DS |
| 80 | SSR | DS | DSR1 |
| 90 | SSRH | DSR1 | DSR2H |
| 100 | DSR1 | DSR2H | TSR2 |
| 110 | DSR1 | DSR2 | QS |
| 120 | TS | DSR2H | TSR2 |
| 130 | DSR2H | TSR2 | TSR3 |
| 140 | TSR2 | TSR3 | TSR3H |
| 150 | TSR3H | TSR3H | QSR4 |
| 160 | QSR4 | QSR4 | QSR4 |
| 170 | QSR4 | QSR4 | |
| 180 | QSR4 | ||
| 1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
| 2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
With the spirit of high quality, excellent service and development, we pay attention to details and pursue perfect management concepts to produce Plastic Pontoon Easy Dock Modular Pontoon Access Bridge with stable and reliable performance. We maintain a high degree of market acumen, explore scientific business models, and bravely be the leader in industry construction. Our company adheres to the tenet of 'treat customers with sincerity and win with quality', gathers professionals, constantly innovates and introduces advanced design and technology, and our strength is in the leading position among peers.
Hot Tags: Modular Bridge, loading bridge, China, manufacturers, factory, wholesale, cheap, bridge for concerts, two lane bridge, Steel Formwork Panel, bridge for landfills, bailey bridge part for commercial areas, bailey bridge joint parts
Send Inquiry
You Might Also Like





