Prefabricated Design Steel Structure Bridges
Description
Technical Parameters
Through our continuous efforts and the long-term support of our customers, we have now become a large-scale and fast-developing enterprise in the Bailey Bridge Sway Brace, steel frame buildings for sale, Bailey screw bolt industry. We sincerely look forward to establishing long-term partnerships with customers and friends at home and abroad to create brilliant tomorrow! We always adhere to follow the honesty, mutual benefit, common development, after years of development and the tireless efforts of all staff, now has perfect export system, diversified logistics solutions, comprehensive meet customer shipping, air transport, international express and logistics services. We always continually offer you the most conscientious purchaser services, and the widest variety of designs and styles with finest materials. We have advanced production equipment, first-class technical force and rich production experience. We insist on customer-centric, continue to create long-term value for customers. To provide effective service to customers is the direction of our work and the yardstick of value evaluation.
Specifications
1 Easy assembled
2 Fast installing
3 Light transportation
4 Factory provide directly
5 Good interchangeability
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SS |
60 | SS | SS | SS |
70 | SS | SS | SSR |
80 | SS | SSR | SSR |
90 | SSR | SSR | SSR |
100 | SSR | SSR | SSR |
110 | SSR | SSR | DS |
120 | SSR | DS | DSR1 |
130 | DS | DSR1 | DSR2H |
140 | DSR1 | DSR2H | DSR3H |
150 | TSTSR2 | DSR2H | DSR4H |
160 | DSR2H | DSR2H | TSR2 |
170 | TSR2 | TSR2 | TSR3 |
180 | TSR2 | TSR3 | TSR3H |
190 | TSR3H | TSR3 | QSR4 |
200 | QSR4 | TSR3QSR3 | QSR4 |
Span Construction-Load Table --- Double Lane (W=7350mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SSR |
60 | SS | SSR | SSR |
70 | SSR | SSR | DS |
80 | SSR | DS | DSR1 |
90 | SSRH | DSR1 | DSR2H |
100 | DSR1 | DSR2H | TSR2 |
110 | DSR1 | DSR2 | QS |
120 | TS | DSR2H | TSR2 |
130 | DSR2H | TSR2 | TSR3 |
140 | TSR2 | TSR3 | TSR3H |
150 | TSR3H | TSR3H | QSR4 |
160 | QSR4 | QSR4 | QSR4 |
170 | QSR4 | QSR4 |
|
180 | QSR4 |
|
|
1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
Under the guidance of the corporate philosophy of trust and creation, we actively carry out various businesses focusing on the development and sales of Prefabricated Design Steel Structure Bridges, and lay the foundation for development. Strive for the development and success of customers, let us work together to create a better future. What we offer each of our customers is a tangible efficiency that gets to the root of the problem in a short period of time.
Hot Tags: Temporary Bridge, China, manufacturers, factory, wholesale, cheap, easy to maintain bridge frame, bridge for race tracks, inclined bridge frame, bailey bridge part for flood relief, bridge for zoos, bailey bridge part packaging
Next
No InformationSend Inquiry
You Might Also Like