
Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge
Description
Technical Parameters
We continue to innovate according to the needs of our customers, conduct transparent cooperation with our partners, and provide customers with the best comprehensive solutions and services in the field of Galvanized Steel Pipe Bridge, steel foot bridge, model bridges. We follow the law of enterprise development, deepen the lean management concept, and continue to promote management innovation. Our company adheres to the management concept of establishing an enterprise by quality, continuously carries out technological innovation and management innovation, actively participates in international competition and cooperation and strives to remain the leader of the industry for a long time.
Bailey Suspension bridge Introduction
Suspension Bailey Bridge is a kind of suspended-cable-system bridge,in which the steel decks are used as members,can be exerted the steel characteristic of high tensile totally in a big span,mainly used to span the wide river,bay and canyon,possessing the advantages of quick erection,short construction time and the bridge components can be used repeatedly;The span length is adapted to 60-300m.
It consists of bailey bridge as main girder,cables and tower.
Bailey Suspension Bridge main girder
We adopt bailey bridge as the main girder suspension bridge. The Bailey bridge is a type of portable, pre-fabricated, truss bridge. It was developed by the British during World War II for military use and saw extensive use by both British and the American military engineering units.
A Bailey bridge had the advantages of requiring no special tools or heavy equipment to assemble. The wood and steel bridge elements were small and light enough to be carried in trucks and lifted into place by hand, without requiring the use of a crane. The bridges were strong enough to carry tanks. Bailey bridges continue to be extensively used in civil engineering construction projects and to provide temporary crossings for foot and vehicle traffic.
The success of the Bailey bridge was due to its unique modular design, and the fact that one could be assembled with minimal aid from heavy equipment. Most, if not all, previous designs for military bridges required cranes to lift the pre-assembled bridge and lower it into place. The Bailey parts were made of standard steel alloys, and were simple enough that parts made at a number of different factories could be completely interchangeable. Each individual part could be carried by a small number of men, enabling army engineers to move more easily and more quickly than before, in preparing the way for troops and matériel advancing behind them. Finally, the modular design allowed engineers to build each bridge to be as long and as strong as needed, doubling or tripling up on the supportive side panels, or on the roadbed sections.
For many years, we have relied on professional management and a technical team committed to producing first-rate Prefabricated Steel Structure Bridge/Steel Girder/Truss Bridge/Arch Suspension Bridge/ Cable-Stayed Bridge/Beam Cantilever Pedestrian Bridge/Railway Bridge. Please don't hesitate to contact us if you are interested in our products. Our main target is keeping the high quality and reliability of products for our customer. We hope we can have a chance work with the customers in domestic and overseas.
Hot Tags: suspension bridge, pedestrian suspension bridge, China, manufacturers, factory, wholesale, cheap, Bailey Bridge Baseplate, information on truss bridges, straight bridge frame, bridge for water treatment plants, bridge pier foundation, solid bridge frame
Send Inquiry
You Might Also Like





