Steel Metal 0.7mm Q345b Floor Decking Sheet

Steel Metal 0.7mm Q345b Floor Decking Sheet

Specifications 1 Bailey Bridge Component 2 Receive the Press Power from the girder 3 Helpful to the Bridge Locating on Abutment It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge...
Send Inquiry
Chat Now

Description

Technical Parameters

Our company's business has spread all over the world. We are working hard to become a benchmark enterprise in Steel Formwork Panel, Bridge Deck, railway steel bridge industry. Our business is promoted in cooperation because we believe that win-win is the most stable, most efficient and happiest state of cooperation. Our products are widely used in many fields. We believe that our efforts will certainly meet your requirements, sincerely hope that the majority of users come to negotiate and cooperate. We have four leading products. Reliable quality and good integrity service has brought a high reputation for our company . High quality and low price make us have a foothold in the fierce market competition.

Specifications
1 Bailey Bridge Component
2 Receive the Press Power from the girder
3 Helpful to the Bridge Locating on Abutment

It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

The company is committed to the production and development of all types of medium and high-end Steel Metal 0.7mm Q345b Floor Decking Sheet. We're devoted to supply skilled purification technology and options for you personally! Our company adheres to the principle of 'quality first' and constantly develops and innovates.

Hot Tags: bridge bearing plate, steel bearing plate for bridge, China, manufacturers, factory, wholesale, cheap, bailey bridge part retailers, bridge for shipyards, bailey bridge part distributors, Specialized Brace, bailey bridge clip parts, bailey bridge part for mudslide relief

Send Inquiry