Supply Steel Structure Cable Suspension 12cm Temporary Bridge
Description
Technical Parameters
As a way to finest meet up with client's wants, all of our operations are strictly performed in line with our motto 'High Quality, Aggressive Price, Fast Service' for Steel Space Frame Bridge, Welded Grid Panels, bridge girder launcher. After years of development, the company's product categories continue to increase, the production scale and sales scope continue to expand, thus our company has maintained a good and steady development momentum. With a state-of-the-art comprehensive marketing feedback system and 300 skilled workers' hard work, our company has developed all kinds of products ranging from high class, medium class to low class.
Specifications
1 Easy assembled
2 Fast installing
3 Light transportation
4 Factory provide directly
5 Good interchangeability
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SS |
60 | SS | SS | SS |
70 | SS | SS | SSR |
80 | SS | SSR | SSR |
90 | SSR | SSR | SSR |
100 | SSR | SSR | SSR |
110 | SSR | SSR | DS |
120 | SSR | DS | DSR1 |
130 | DS | DSR1 | DSR2H |
140 | DSR1 | DSR2H | DSR3H |
150 | TSTSR2 | DSR2H | DSR4H |
160 | DSR2H | DSR2H | TSR2 |
170 | TSR2 | TSR2 | TSR3 |
180 | TSR2 | TSR3 | TSR3H |
190 | TSR3H | TSR3 | QSR4 |
200 | QSR4 | TSR3QSR3 | QSR4 |
Span Construction-Load Table --- Double Lane (W=7350mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SSR |
60 | SS | SSR | SSR |
70 | SSR | SSR | DS |
80 | SSR | DS | DSR1 |
90 | SSRH | DSR1 | DSR2H |
100 | DSR1 | DSR2H | TSR2 |
110 | DSR1 | DSR2 | QS |
120 | TS | DSR2H | TSR2 |
130 | DSR2H | TSR2 | TSR3 |
140 | TSR2 | TSR3 | TSR3H |
150 | TSR3H | TSR3H | QSR4 |
160 | QSR4 | QSR4 | QSR4 |
170 | QSR4 | QSR4 |
|
180 | QSR4 |
|
|
1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
After years of hard work, our company has accumulated rich experience in the Supply Steel Structure Cable Suspension 12cm Temporary Bridge industry, and we look forward to cooperating with you sincerely. Welcome to negotiate business. Our company regards product quality as the life of enterprise development and has established a strict quality assurance system. With high-quality R&D team and rich manufacturing experience, we have won the trust of users at home and abroad. We are willing to provide you with 100% satisfactory service with excellent quality, advanced technology, cost-effective products, and a professional team.
Hot Tags: Temporary Bridge, China, manufacturers, factory, wholesale, cheap, Weigh Bridge, floating bridge with corrosion protection coating, bailey bridge part bridging, strong transom, bailey bridge spares, bridge for fairs
Next
No InformationSend Inquiry
You Might Also Like