Bridge Lowering and Securing
Jul 08, 2026
Leave a message
Once the bridge nose successfully reaches the opposite abutment, the final stages of installation begin.
Precise Positioning: Using jacks and other equipment, the entire bridge is slowly lowered from its rocking supports and precisely placed onto the pre-installed bearing points on both banks.
Complete Securing: Install all remaining components, including end columns, deck panels, guardrails, and finally tighten all connecting pins and bolts. Reinforcing structures such as wind-resistant tie rods are installed as needed.