Bailey Steel Bridge Technology And Site Management
Apr 13, 2026
Leave a message
Here's the English translation of the technical and on-site management points for Bailey steel bridges:
Geotechnical Investigation: A geotechnical investigation must be completed before installation to ensure that the bearing capacity of the foundation meets the design requirements.
Strict Construction: Ensure that the construction plan is scientifically sound, strictly comply with standards such as the Technical Specifications for Construction of Highway Bridges and Culverts, and assign dedicated personnel for supervision.
Regular Inspections: Conduct regular inspections of the bridge structure during service, especially under high loads or adverse environmental conditions.

