
0.90mm Composite Opened Floor Load Bearing Steel Sheet
Description
Technical Parameters
By adhering to high-quality products and services, we ensure that we never lower the quality of our bridge pier foundation, precast concrete bridge panels, River Bridge for reasons of competitiveness. The culture of trust and respect allows everyone in our company to have a high sense of responsibility and can take responsibility for their own work. We realize that providing high-quality and high-performance products is a very important success factor for a company to establish long-term cooperative relationships with customers. We are determined to make forward-looking contributions to the development of the industry and making our product a first brand. Our company requires the sales staff to keep zero distance contact with users all the time, provide customers with fast and high-quality service and meet the needs of customers with high-quality solutions.
Specifications
1 Bailey Bridge Component
2 Receive the Press Power from the girder
3 Helpful to the Bridge Locating on Abutment
It is used for setting bridge chair, and distributing evenly the load to groundwork. The letter 1, 2 & 3 marked on the bed plate represent respectively the bridge chair center-line positions of single-row, dual-row and triple-row. On the other side of the bed plate is marked the center-line position of span bridge direction.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
We thinks what buyers think, the urgency of urgency to act during the interests of a purchaser position of theory, allowing for much better high-quality, reduced processing costs, charges are more reasonable, won the new and outdated consumers the support and affirmation for 0.90mm Composite Opened Floor Load Bearing Steel Sheet. We respond to customers' demands or complaints as soon as possible and pay attention to customer experience and satisfaction. Our perfect after-sales service ensures that the problems encountered by customers in the course of product use can be solved in time.
Hot Tags: bridge bearing plate, steel bearing plate for bridge, China, manufacturers, factory, wholesale, cheap, bridge for colleges, bridge for tennis courts, bridge for heritage sites, Bailey Bridge Parts, Large Span Bridge, bailey bridge part for wildfire relief
Send Inquiry
You Might Also Like






