Assemble Steel Bailey Bridge Cost Design Prefabricated Bridge

Assemble Steel Bailey Bridge Cost Design Prefabricated Bridge

Specifications 1 Less expense, wide usage 2 Assembled by 10ft panel 3 Send engineers to guide labor 4 1050 deck 5 Factory direct export Application of the compact standard 200 panel bridge: Single lane: Bridge deck width: 4.2m. Span length: 9.14-76.2m Double lanes: Bridge deck width: 7.4m. Span...
Send Inquiry
Chat Now

Description

Technical Parameters

We have been in line with the product quality is the fundamental business philosophy, all sales of Steel Frame Bridge, zinc chord reinforcement, Bailey Bridge Parts are of high quality. This company insists on initial design concepts and innovative style purchasing. Since the establishment of our company, we have realized the importance of providing good quality products and the best before-sales and after-sales services. Our company is continuing to serve customers with high quality, competitive price and timely delivery. We continue to keep increasing and perfecting our solutions and service.

Specifications

1 Less expense, wide usage
2 Assembled by 10ft panel
3 Send engineers to guide labor
4 1050 deck
5 Factory direct export

Application of the compact standard 200 panel bridge:
Single lane: Bridge deck width: 4.2m.     Span length: 9.14-76.2m
Double lanes: Bridge deck width: 7.4m.    Span length: 9.14-57.9m

The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.  Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.

The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

We will make every effort to be outstanding and perfect, and accelerate our steps for standing in the rank of international top-grade and high-tech enterprises for Assemble Steel Bailey Bridge Cost Design Prefabricated Bridge. We adhere to the business philosophy of quality as the foundation of survival, product intelligence as the transformation, market as the development orientation, customer service as the foundation, and technological innovation as the drive. The continuous updating of our products, the diligent pursuit of quality, and the consistent service to users have won wide recognition and trust from users and friends.

Hot Tags: Bridge Crossing, China, manufacturers, factory, wholesale, cheap, easy installed bailey bridge, Wrought Iron Panel, bridge for resorts, container bridge fitting, bailey bridge part for avalanche relief, bridge for heritage sites

Send Inquiry