
Bailey Bridge Specification Durable Steel Structural Bailey Steel Truss
Description
Technical Parameters
We will make wonderful endeavours to produce new and top-quality merchandise, satisfy your exclusive requirements and supply you with pre-sale, on-sale and after-sale services for detachable steel bridge, Double Deck Structure, Double Lane Bridge. We will continue to develop, to provide the high-quality products and services, and promote lasting cooperation with our customers. We sincerely count on exchange and cooperation with you.
Specifications
1 Easy assembled
2 Fast installing
3 Light transportation
4 Factory provide directly
5 Good interchangeability
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SS |
60 | SS | SS | SS |
70 | SS | SS | SSR |
80 | SS | SSR | SSR |
90 | SSR | SSR | SSR |
100 | SSR | SSR | SSR |
110 | SSR | SSR | DS |
120 | SSR | DS | DSR1 |
130 | DS | DSR1 | DSR2H |
140 | DSR1 | DSR2H | DSR3H |
150 | TSTSR2 | DSR2H | DSR4H |
160 | DSR2H | DSR2H | TSR2 |
170 | TSR2 | TSR2 | TSR3 |
180 | TSR2 | TSR3 | TSR3H |
190 | TSR3H | TSR3 | QSR4 |
200 | QSR4 | TSR3QSR3 | QSR4 |
Span Construction-Load Table --- Double Lane (W=7350mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SSR |
60 | SS | SSR | SSR |
70 | SSR | SSR | DS |
80 | SSR | DS | DSR1 |
90 | SSRH | DSR1 | DSR2H |
100 | DSR1 | DSR2H | TSR2 |
110 | DSR1 | DSR2 | QS |
120 | TS | DSR2H | TSR2 |
130 | DSR2H | TSR2 | TSR3 |
140 | TSR2 | TSR3 | TSR3H |
150 | TSR3H | TSR3H | QSR4 |
160 | QSR4 | QSR4 | QSR4 |
170 | QSR4 | QSR4 |
|
180 | QSR4 |
|
|
1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
With the goal of building a sustainable and international Bailey Bridge Specification Durable Steel Structural Bailey Steel Truss industry, we are committed to providing better products and more considerate services to global consumers. Our company has accumulated some long-term cooperative partners for ourselves with our good faith, considerate and warm service. All our employees uphold the spirit of dedication, hard work and innovation, the pursuit of excellence and continuous improvement.
Hot Tags: Temporary Bridge, China, manufacturers, factory, wholesale, cheap, triangular bridge frame, bailey bridge part for religious areas, painted bailey bridge parts, bridge for crematoriums, bridge for flood prevention, assembly steel bridge
Next
No InformationSend Inquiry





