
Specializing in The Production of Lh Type Electric Hoist Double Girder Bridge Crane
Description
Technical Parameters
Through continuous exploration and discovery, our antioxidant bridge component, sway braces for piping, Steel Arch Bridge always maintains unique advantages and is deeply favored by customers. With preferential prices and high-quality services, we hope to satisfy customers and achieve a win-win situation. We provide good quality but unbeatable low price and the best service. We always follow the management principles of science first, quality first, and customer first, with the goal of promoting product structure optimization and production standardization. We always firmly believe that innovation is the way to achieve success, integrity is the foundation of a hundred years of business, we wholeheartedly provide you with reliable quality products and satisfactory service, welcome the new and old customers from all walks of life to patronize and guide!
Specifications
1 Less expense, wide usage
2 Assembled by 10ft panel
3 Send engineers to guide labor
4 1050 deck
5 Factory direct export
Application of the compact standard 200 panel bridge:
Single lane: Bridge deck width: 4.2m. Span length: 9.14-76.2m
Double lanes: Bridge deck width: 7.4m. Span length: 9.14-57.9m
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Our company is a rigorous and passionate service provider of Specializing in The Production of Lh Type Electric Hoist Double Girder Bridge Crane. We are committed to becoming a global leading company and hope that our products can bring positive impact and value to the world. Based on the enterprise concept of 'honesty, trustworthiness, professionalism and innovation', we strive for development with technology, survive with quality, serve every customer and devote ourselves to every product.
Hot Tags: Bridge Crossing, China, manufacturers, factory, wholesale, cheap, bridge for streams, bridge for flood control, bailey bridge part over canyon, detachable bailey bridge parts, permanent bailey bridge parts, high strength bailey bridge parts
Send Inquiry
You Might Also Like





