
Steel Structure Factory 80 Tons Double Beam Overhead Bridge Crane
Description
Technical Parameters
Looking to the future, we will uphold and implement our vision of becoming a global industry leader and our mission of creating high quality composite panels for sale, alloy steel plate for construction, bridge pier foundation. No matter where you will be from, we have been here to wait for your sort ask for, and welcome to go to our manufacturing facility. We adhere to the new system, efficient management, excellent technology, excellent quality to provide customers with satisfactory service. We sincerely hope that you can provide valuable suggestions and enthusiastic help to our work. With strict production technology, perfect testing methods, and complete production facilities, we have a place in the fierce market competition and meet the continuous needs of customers.
Specifications
1 Bailey Type bridge
2 Portable pre-fabricated truss bridge
3 Fast Install
4 easy assemble
5 light transport
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
| Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SS |
| 60 | SS | SS | SS |
| 70 | SS | SS | SSR |
| 80 | SS | SSR | SSR |
| 90 | SSR | SSR | SSR |
| 100 | SSR | SSR | SSR |
| 110 | SSR | SSR | DS |
| 120 | SSR | DS | DSR1 |
| 130 | DS | DSR1 | DSR2H |
| 140 | DSR1 | DSR2H | DSR3H |
| 150 | TSTSR2 | DSR2H | DSR4H |
| 160 | DSR2H | DSR2H | TSR2 |
| 170 | TSR2 | TSR2 | TSR3 |
| 180 | TSR2 | TSR3 | TSR3H |
| 190 | TSR3H | TSR3 | QSR4 |
| 200 | QSR4 | TSR3QSR3 | QSR4 |
| Span Construction-Load Table --- Double Lane (W=7350mm) | |||
| SPAN-ft | HS-15 | HS-20 | HS-25 |
| 30 | SS | SS | SS |
| 40 | SS | SS | SS |
| 50 | SS | SS | SSR |
| 60 | SS | SSR | SSR |
| 70 | SSR | SSR | DS |
| 80 | SSR | DS | DSR1 |
| 90 | SSRH | DSR1 | DSR2H |
| 100 | DSR1 | DSR2H | TSR2 |
| 110 | DSR1 | DSR | QS |
| 120 | TS | DSR2H | TSR2 |
| 130 | DSR2H | TSR2 | TSR3 |
| 140 | TSR2 | TSR3 | TSR3H |
| 150 | TSR3H | TSR3H | QSR4 |
| 160 | QSR4 | QSR4 | QSR4 |
| 170 | QSR4 | QSR4 | |
| 180 | QSR4 | ||
| 1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
We are going to make every single effort for being excellent and excellent, and accelerate our ways for standing while in the rank of international top-grade and high-tech enterprises for Steel Structure Factory 80 Tons Double Beam Overhead Bridge Crane. We realize that providing high-quality and high-performance products is a very important success factor for a company to establish long-term cooperative relationships with customers. We insist on first-class quality, reasonable price and first-class service, starting from what customers need and ending with customer satisfaction.
Hot Tags: high quality steel structure bridge, China, manufacturers, factory, wholesale, cheap, bailey bridge part inspection, bridge for mining sites, bridge for cultural events, bailey bridge part packaging, steel bridge decking, bailey bridge part for short term use
Send Inquiry
You Might Also Like





