
Temporary Steel Pier Construction Grade 50d Bridge
Description
Technical Parameters
We are commitment to offer you the aggressive price tag, exceptional products and solutions high-quality, as well as fast delivery for Specialized Brace, Composite Panel, Heavy Bridge. Our company has always been market-oriented as the principle, constantly absorb market information to understand customer needs and in line with the world to produce customer satisfaction products. Over the years of development, after continuous reform and innovation, we have also formed strategic partnerships with many domestic and foreign customers. Our company insists on the tenet of striving for survival with quality and reputation as the foundation, and the service market is also gradually facing international. We uphold the core values of creating value for our partners, and take honesty, tolerance, innovation and service as our corporate spirit.
Specifications
1 Easy assembled
2 Fast installing
3 Light transportation
4 Factory provide directly
5 Good interchangeability
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree. Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.
Span Construction-Load Table --- Extra Single Lane (W=4200mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SS |
60 | SS | SS | SS |
70 | SS | SS | SSR |
80 | SS | SSR | SSR |
90 | SSR | SSR | SSR |
100 | SSR | SSR | SSR |
110 | SSR | SSR | DS |
120 | SSR | DS | DSR1 |
130 | DS | DSR1 | DSR2H |
140 | DSR1 | DSR2H | DSR3H |
150 | TSTSR2 | DSR2H | DSR4H |
160 | DSR2H | DSR2H | TSR2 |
170 | TSR2 | TSR2 | TSR3 |
180 | TSR2 | TSR3 | TSR3H |
190 | TSR3H | TSR3 | QSR4 |
200 | QSR4 | TSR3QSR3 | QSR4 |
Span Construction-Load Table --- Double Lane (W=7350mm) | |||
SPAN-ft | HS-15 | HS-20 | HS-25 |
30 | SS | SS | SS |
40 | SS | SS | SS |
50 | SS | SS | SSR |
60 | SS | SSR | SSR |
70 | SSR | SSR | DS |
80 | SSR | DS | DSR1 |
90 | SSRH | DSR1 | DSR2H |
100 | DSR1 | DSR2H | TSR2 |
110 | DSR1 | DSR2 | QS |
120 | TS | DSR2H | TSR2 |
130 | DSR2H | TSR2 | TSR3 |
140 | TSR2 | TSR3 | TSR3H |
150 | TSR3H | TSR3H | QSR4 |
160 | QSR4 | QSR4 | QSR4 |
170 | QSR4 | QSR4 |
|
180 | QSR4 |
|
|
1.SS shows one range one tier; DS shows two ranges one tier; TS shows three ranges one tier; DD shows two range two tiers etc. | |||
2.If R follows SS, DS, DD, etc, means reinforce type,and R1 means only one range reinforced, R2 means two ranges reinforced etc. | |||
Continuous development and meeting customer needs are our eternal pursuit. In the current global economic integration and increasingly fierce market competition, we will continue to uphold the pragmatic and innovative entrepreneurial spirit to provide customers with high-quality Temporary Steel Pier Construction Grade 50d Bridge and services. Please feel cost-free to speak to us for small business and we believe we'll share the best trading experience with all our merchants. Our company advances with the strategy of 'technology-oriented, quality for survival, and reputation for development'.
Hot Tags: Temporary Bridge, China, manufacturers, factory, wholesale, cheap, bridge for infrastructure development, bailey emergency bridge, strong transom, bridge engineering, bailey bridge part for populated areas, bridge for technology parks
Next
No InformationSend Inquiry
You Might Also Like






