For a Bailey steel bridge project
Apr 27, 2026
Leave a message
For a Bailey steel bridge project, a whole-process quality management system shall be established, covering the following aspects:
| Stage | Key Quality Control Points | Responsible Entity |
|---|---|---|
| Survey and Design | Accuracy of geological data, reliability of design calculations | Survey and design institute |
| Material Receiving | Quality certification documents for Bailey panels and accessories, visual inspection | Materials Department, Quality Inspector |
| Assembly Construction | Geometric dimensions, connection quality | Construction team, Quality Inspector |
| Erection Construction | Erection techniques, safety measures | Construction crew, Safety Officer |
| Acceptance Testing | Load test, documentation archiving | Project Technical Leader |
| Operation and Maintenance | Inspection records, maintenance | Operation and maintenance unit |

