Bailey Steel Bridge Accessories Bailey Panel Assembly
Oct 28, 2021
Leave a message
During the hanging and pulling construction, the beret was manually moved to the I-beam through the inclined plane of the lantern frame, which overcomes the process that cannot be completed by a large crane. During construction, in order to ensure the deformation after pouring, 4.5cm of pre-arch was adopted. After actual implementation, the deformation result after pouring is 3cm, which meets the requirements of bridge construction.
The Bailey film is assembled on the bridge and moved manually to the I-beam through the inclined plane of the lantern frame, which overcomes the process that cannot be completed by a large crane. In actual construction, in order to ensure the deformation after pouring, 4.5cm of pre-arch is adopted. After actual implementation, the deformation result after pouring is 3cm, which meets the requirements of bridge construction.