 (1) Before the rapid erection of fast-installed bailey bridge assembly construction, the construction leader shall conduct pre-job training for all the construction personnel, so that all the operation personnel can understand the operation procedures, technical quality standards and operation safety regulations.

 

(2) During the hoisting process of fast-installed bailey bridge, surveyors should often check the beam position, beam elevation and bolt torsion, find and solve problems in time, and ensure the quality and safety of the project.

 

(3) Due to the rapid erection of the assembly of fast-installed bailey bridge, such as rod handling, bolt application and high-altitude assembly and push operation, there are many safety risks and hidden dangers. There should be a full-time safety officer on site to follow the work and timely remind and correct the unsafe factors in the construction.

 

(4) The site construction personnel shall strictly follow the technical disclosure of the project department and the operation safety operation rules.

 

(5) After the rapid erection of fast-installed bailey bridge, special personnel shall be arranged for regular maintenance and maintenance of the platform frame, and obvious identification plates shall be set up. Overloading is strictly prohibited.