Two Practical Issues To Note During Inspection
Nov 16, 2026
Leave a message
First, the dimensions of rented components differ from those of newly fabricated components. Rented Bailey panels generally show slight signs of reuse. The focus of inspection should not be on whether they are "brand new," but on quantifying the extent of defects and assigning responsibility. When the components arrive on site, photographs should be taken for each batch, and the original deformation, corrosion, and damage should be recorded in writing and confirmed by signatures from both parties, so that pre-existing defects are not counted as construction wear and tear upon return.
Second, written records are just as important as physical inspection. In addition to certificates of conformity and material test reports, traceable inspection records should be retained for items involving non-destructive testing of welds, high-strength bolt torque, coating thickness, and load testing. For important or long-span Bailey steel bridges, a static load test (commonly at 1.2 times the design load) and settlement monitoring are usually required before the bridge is put into service, and it may only be released after passing inspection.