What Points Should Be Paid Attention To During The Construction Of Bailey Bridge?
Dec 31, 2020
Leave a message
1. Construction procedures
Construction preparation → pier foundation treatment → concrete pouring of abutment → erection of bailey steel bridge.
2. Overall construction layout
According to site construction conditions and construction progress plan, to two abutment foundation excavation, foundation excavation is completed, the abutment of concrete construction, abutment construction at the same time, two at the same time in the concrete construction of abutment excavation of water between the two sides abutment section of, after being abutment concrete meet the design strength, bailey bridge installed.
3. Preparation for construction
(1)Construction road
The construction road uses the excavation construction road, and at the same time builds a lower foundation pit road, connects the construction area and the excavation construction road.
(2) Construction electricity
The project mainly uses electricity to access nearby from the construction area.
(3) measurement
Before construction, the position and terrain of the abutment shall be measured and laid out, the foundation elevation shall be determined, and the foundation excavation sideline, central control point and the axis along the bridge shall be set out according to the design size of the abutment. During pouring construction, bailey bridge should check the formwork regularly and strictly control the shape and elevation of piers.