Bailey beam diagonal bracket mounting

Jul 18, 2023

Leave a message

After installing the inclined bracket on the beam, install the third part of the truss, install the wind tension rod on the first part of the truss sheet, and install the inclined bracket on the second part of the truss sheet beam, and install the nose frame in turn, a total of four parts of the truss sheet as the nose frame. Bellay bridge traction by winch, traction process, should be unified command, steps and operation coordination. Check roller and bridge operation at all times. If any situation is found, the operation should be stopped immediately, and after the problem is solved, the bridge should be pushed to the position, and the jack bracket, steel plate and wind tie rod should be removed.

 

Each section of Bailey Bridge is mounted with a variety of support frames that strengthen the joint misalignment between the chord and the horizontal support frame, thereby reducing the displacement of the main beam caused by the deformation of the truss joint. Tighten all bolts and nuts connecting the truss and insert the safety pin after the truss pin is in place. The main beam needs to strengthen the installation of the chord, and all support positions need to be locally strengthened to prevent the chord from being deformed by excessive local stress. The three parts of the end of the main beam adopt high shear trusses, which form the necessary bending degree after assembly and reduce the downward torsion. The main beam of the Beret bridge is connected with the beam as a whole, and can be dragged after the length reaches 10 meters.

Send Inquiry