Bailey bridge reinforcement system construction of a point

Aug 17, 2022

Leave a message

The goal of Bailey bridge project reinforcement is to achieve the repair, reinforcement, improvement of bearing capacity, strengthen the use of function through the process of reinforcement construction, so that the choice of reinforcement scheme should be based on the improvement of the quality of the reinforcement project. There are also improper construction preparation and quality assessment standards for inappropriate reinforcement schemes. According to the "concrete layout reinforcement craft code" in several typical reinforcement system, follow the construction experience, the inappropriate reinforcement system in the construction should focus on:


1. Prestressed reinforcement method


Adopt prestressed bar reinforcement, before installation required to pull rod ahead of straightening the whole school, tie rod size and installation location must be accurate, tension to improve the quality of welding joint, screw, nut before inspection, berea piece of bailey bridge to the hope that the end Angle steel poles (plate) and embedded into the depth of the power transmission between concrete member and weld quality inspection, after inspection qualified, The two ends of the pole are fixed with screws, and then filled with epoxy mortar or high-strength cement mortar. The reinforced pressure rod limbs, connecting plates, fastening plates and tension bolts should be coated with anti-rust paint for anti-corrosion.


Send Inquiry