Daily Work in the Finishing and Acceptance Stage of Bailey Steel Bridge
May 30, 2025
Leave a message
Detail Improvement
Install ancillary structures such as guardrails, anti-slip strips, and drainage facilities.
Reapply anti-rust paint or carry out anti-corrosion treatment as required by the design.
Load test and inspection
Conduct static/dynamic load tests to monitor the deformation and vibration data of the bridge.
Check all connection points for looseness, weld cracks and other issues.
Document record
Fill in the construction log, recording the progress, problems and corrective measures of the day.
Take video and photo materials to keep evidence for the acceptance of key nodes.