How to install the chord?

Apr 16, 2021

Leave a message

Chord jacks are only used when upper trusses are installed. After the first floor is installed on the bridge, due to the gap between the dead weight of the structure and the pin hole, the lower part of the bridge will bend or arch, resulting in the joints stagger during the installation of the upper truss. At this time, the upper truss must be pushed and pulled into position with the chord hanger, and then bolted.

 

When bailey steel bridge is bent down, the second truss is to be installed. The upper pin holes of the front and back trusses can be conveniently aligned and inserted into the pin holes. The lower pin hole of the truss is bound to stagger due to the sag of the upper chord of the lower bridge, so it needs to be aligned by external force. At this time, with truss bolts (need not tighten) one of the truss, behind another truss, mount installed on the bridge at the bottom of the upper chord, use bolt holes to mount connected to the underlying truss, placed between the saddle and the truss diamond jack, with a wrench rotation jack bolt (if necessary, with sleeves on the pull handle, to increase the rotation radius, reduce the pull force). The diamond jack is gradually opened from its initial closed position, at which point one end of the jack is pushed against the seat frame and the other end is pushed against the truss. The adjacent pin holes staggered in the lower half are slowly drawn together until they are aligned, and then the pins are inserted. In case of truss top push end for the Yin head, Yin head pad iron, diamond jack pad iron.


Send Inquiry