Technical difficulties in the erection process of Bailey steel bridges

May 08, 2025

Leave a message

High requirements for component assembly accuracy
The connection of Bailey sections, pins, and crossbeams must be precisely aligned; misalignment can lead to stress concentration or installation failure, especially during night or adverse weather conditions.
Insufficient tightening of bolts or pins may cause structural loosening and requires repeated checks.
High risks in hoisting operations
Long-span bridge sections need to be hoisted in segments. Improper control of the center of gravity can lead to overturning (such as the front end drooping during cantilever advancement).
In narrow sites, the positioning of cranes is restricted, and manual assistance with chain blocks may be required for precise positioning.
Stability of temporary supports
During cantilever erection, the temporary abutments of the uncompleted bridge sections need to bear asymmetric loads. Settlement or tilting can trigger a chain reaction.
For multi-span continuous bridges, the intermediate abutments need to be adjusted in height simultaneously; otherwise, the bridge deck will be uneven.
Challenges in special environments
Water operations: Current impact affects the stability of floating cranes, requiring the cooperation of anchoring systems.