What do you need to pay attention to when using the Bailey steel bridge support frame

Jul 24, 2023

Leave a message

Bailey steel bridge support rests on a common pillow. The bridge head plate is similar to the longitudinal beam. The difference is that the middle of the I-beam of the bridge head is 12 cm high, and the height of the two ends is the same as the height of the longitudinal beam (10 cm) to keep the bridge floor flat. Bend flange under welded arc support. If the height difference between the bridge floor and the road surface is large, two or more lapping plates can be used, and the middle is supported by a beam, and the beam is placed within the four lapping plates.

 

Bailey steel bridge rock: used to control the starting direction of the analysis frame and bear the weight of the bridge. There are half crescent pads underneath to support the axle of the bridge. Rock can be moved up and down freely, with four small rollers on either side. When pushing and pulling the bridge span, the strings under the analysis frame are always controlled in the rock center to ensure the direction of the bridge span when pushing and pulling. When building Bridges, rock should be set on both sides. Rock weighs 102 kg, Big weight 250 kg. The height of rock on the bridge is 37.4 cm, on the bridge and on the rock template.

Send Inquiry