Bailey Steel Bridge Piling Construction Matters Needing Attention?

Jun 15, 2021

Leave a message

Bailey steel bridge can be quickly assembled in place, applicable to different spans, different loads of steel bridge, municipal engineering water conservancy and hydropower projects, dangerous bridge structure reinforcement and other aspects of common. 

Bailey steel bridge to achieve temporary bridge. There are many things we need to pay attention to when we build a steel bridge. Because the construction of steel bridge will affect the passing ships. Passing ships also have a big impact on the stability of the bridge. So we have to do some protective measures when building steel bridge.

Bailey steel bridge piling construction matters needing attention?

1. During piling, in order to prevent ships from running into the wooden piles at night, the project department installs red warning lights on the piles to remind passing ships and ensure the stability of water traffic at night.

2. After the piling ship docks, the wire rope should be tied, the protective measures of high tide and low tide should be paid attention to, and the ball should be hung on the side of the ship.

3. After the completion of the construction of the bridge, hang neon lights in the navigable holes of the bridge and open them at night to remind passing ships.

4. Specialty personnel are assigned to the piling ship of the project department to inspect and command the passing ships. Coloured flags and other signs are temporarily hung on the finished piles to prevent ships from colliding and grounding.