Measures For The Erection Of Bailey Steel Bridges

Jul 22, 2025

Leave a message

Comprehensive pre-construction investigation and design: Conduct detailed on-site investigation, precise measurement, fully consider various adverse factors, and formulate a scientific and reasonable erection plan (including foundation treatment, erection methods, hoisting plans, and emergency plans).
Strict material management: Establish a complete system for component inventory, inspection, marking, storage, and issuance. Conduct strict screening and assessment of old components.
Precise measurement and monitoring: High-precision measurement and layout throughout the process, as well as line shape monitoring, with timely correction.
Professional construction teams: Select experienced, skilled, and safety-conscious construction teams, and provide thorough pre-job training and technical briefings.
Reliable equipment support: Choose well-performing and appropriately rated lifting and transportation equipment, and ensure their good working conditions.
Comprehensive safety management: Establish a sound safety management system, provide adequate safety protection facilities (safety belts, safety nets, platforms, guardrails, etc.), strengthen on-site safety supervision and inspection, and strictly enforce safety operation procedures.
Detailed construction organization: Prepare detailed construction organization designs and operation instructions, optimize work procedures, and enhance on-site coordination and scheduling.
Emergency plans and drills: Develop targeted emergency plans, stockpile emergency supplies, and conduct drills.