The Actual Construction Steps Of The Bailey Steel Bridge
Jul 07, 2025
Leave a message
Starting from the foundation treatment, although the Bailey bridge has low requirements for the foundation, uneven ground can easily cause problems. Then comes the assembly sequence of the truss pieces, first the main truss, then the cross beams, and finally the bridge deck. Here, it is important to emphasize the tightening and inspection of the connecting parts. Loose bolts are a common hazard.
In the final acceptance stage, in addition to load testing, daily maintenance is also very important. Users may want to know how to maintain the bridge after construction, such as regular inspection of bolts and anti-corrosion treatment. In addition, measures to deal with special environments, such as anti-slip measures during construction in the rainy season, may also be of concern to users.