The Layout Of Steel Bridge Assembly Site
Jun 05, 2023
Leave a message
In order to facilitate the bridge building operation, according to the terrain and road conditions of the bridge site, the position of stacking bridge parts, tools, bridge building equipment and vehicle turn-around should be planned at the bridge head on the launching bank. The stacking of bridge components to make artificial handling distance in the assembly of the shortest use of the most convenient on the other side of the river, should be as far as possible to create conditions will be used in the opposite side of the bridge head of the seat plate, flat roll and other equipment, the first transport in place, such as unconditional across the river, can be placed on the plate and peaceful roll on the shelf with the bridge launched, transported to the shore. But the weight of these devices must be taken into account when calculating the stability of the cantilever push-out.