What Markings Should Be Made When Using The Bailey Pieces?

Jan 06, 2025

Leave a message

Warning signs should be set up and placed on the berms to prevent ships and vehicles from colliding with them. Signboards should be set up at the entrance of the bridge to warn that overloaded vehicles are strictly prohibited from crossing this bridge. In addition, it is advisable to avoid stacking loads on the berms as much as possible. When stacking, under the premise of not endangering the overload passage, the loads should be evenly distributed and not concentrated in one area to prevent excessive stress on certain parts.

Weld seams that appear between the berths and the cast iron parts should be immediately repaired by welding. Regularly check the loosening and falling off of the pins and retaining rings at the connection points of the berths. After the concrete pouring of the berths is completed, the exposed surface should be promptly covered with straw mats, straw bags or plastic films, and watered for moist curing. Pour the joints of the berths at suitable positions to accelerate heat dissipation. When pouring large volume concrete on rock foundations or thick concrete pads, place a sliding layer on the pad.

Send Inquiry