Bailey Steel Bridge Reminds You Of Key Precautions
Sep 28, 2026
Leave a message
Pin hole connection accuracy: Beare sections are connected via pins. If the misalignment between holes exceeds 1 mm during installation, forcibly hammering or enlarging the holes is strictly prohibited. The cause must be identified and resolved before proceeding.
Drilling quality control: On-site drilling requires strict control over hole diameter, verticality, depth, and hole cleaning quality, as these directly affect pile foundation bearing capacity and bridge safety.
Manufacturing vs. construction differences: Factory pin hole processing aims for micrometer-level fit precision; on-site pile drilling, however, must ensure hole diameter and depth meet design load requirements. The standards and equipment used for these two processes are entirely different.